Heap Leach Pad Liners for Mining Projects
A heap leach pad needs to keep mining solution inside the collection system while supporting a large pile of ore. The liner is buried under that pile. Once the ore is in place, finding and repairing a small damaged area can be difficult.
The useful question is not just which membrane to buy. It is how the liner, protective layers and drains will work together at this site. A permanent heap, a valley pad and a reusable pad can need different arrangements.
Planetliner supplies geomembranes for heap leach project with 10+ years of export experience, we help buyers prepare a material order around their project drawings, delivery needs and agreed specifications. Our polyethylene liners use virgin resin, without recycled resin.
What Is a Heap Leach Pad?
Heap leaching is a way to recover metal from ore. The mine places ore on a prepared, lined area called a heap leach pad. It then applies a mining solution through irrigation lines. As the liquid passes through the ore, it dissolves some of the metal. Pipes at the bottom collect this metal-bearing liquid and carry it toward the recovery plant or collection ponds.
The geomembrane helps keep the liquid from escaping into the soil. It also helps direct it toward the collection pipes. This protects the ground and limits the loss of process solution.But a liner alone cannot make the system work. The ground must support it, the layers above must protect it, and the pipes must carry the liquid away. Well-planned heap leaching pads can meet all three needs.
This page focuses on the pad beneath the ore. For other mine facilities, including tailings areas and separate process ponds, see our mining applications overview.
Why HDPE Is Commonly Considered?
HDPE geomembrane is frequently considered for mining containment because of its combination of mechanical performance and resistance to many chemicals.
But polymer choice alone is not enough.Buyers should also review:
- thickness
- puncture resistance
- stress-crack-related requirements where specified
- chemical compatibility
- weldability
- interface behavior on slopes
Smooth or Textured?
Flat areas may use smooth geomembrane.On slopes, a textured geomembrane may be selected where higher interface friction is required between the liner and adjacent materials.This decision belongs to the slope and stability design.
Choose a System For Different Pad
Permanent heaps where the ore stays in place
In a permanent heap, the ore normally remains on the pad. New layers of ore may be added over time. The lining system must handle the final heap, not just the first layer.
A common arrangement starts with prepared ground and a suitable low-permeability soil layer. This is soil compacted to limit liquid flow. The geomembrane sits above it. Selected material then protects the sheet, while a drainage layer and collection pipes carry the mining solution away.
Before buying, confirm the final heap height, how the ore will be placed and what materials will touch the membrane. A liner protected well enough for the first lift may need a different protection arrangement under the completed heap. A lift is one layer of ore added during stacking.
Some projects use a GCL instead of the specified clay-soil layer. A GCL is a factory-made clay blanket. This change needs review because mining solution can affect the clay, and the blanket changes how the layers grip each other. Do not make the substitution only because it is easier to buy or install.
Valley pads where slopes and stored liquid need extra attention
A valley pad follows the shape of a valley. The ground may vary across the site, and parts of the liner may sit on steep slopes. Some designs also hold mining solution within the facility.
Start by checking how the liquid will reach the outlets and how high it may rise. The lining and drainage plan must match those conditions.
Where the design calls for two barriers, use a primary liner, a layer that collects leakage beneath it, and a secondary liner. The leakage collection layer takes liquid that passes through the upper liner toward a monitoring point. It has a different job from the drains above the liner, which collect the normal process flow. [1]
Show both routes on the drawings. The operator needs to know where each outlet goes and how it will be checked. Also consider ground movement: if the ground sinks unevenly, a drain may lose its slope and stop carrying liquid as intended.
Reusable pads where spent ore is removed
On a reusable pad, ore is leached, removed and replaced. The main risk changes when removal equipment starts working near the buried liner and pipes.
The solution is a designed working layer above the permanent lining system. This layer gives equipment room to work while protecting what lies below. Set clear limits for vehicle routes and removal depth. Crews should not have to guess how close a bucket or blade is to the liner.
Check the working surface and any exposed lining areas after removal. Complete the required repairs and inspections before placing new ore.
These categories can overlap. A permanent heap may also be built in a valley. Use both the operating method and the site shape when preparing the plan.
Decide Which Membrane Goes in Each Area
A material order should identify where each product will be installed. Do not leave the contractor with a choice between several rolls that look similar but serve different parts of the design.
| Area of the pad | Material choice | What to make clear in the order |
| A permanent base with firm, prepared ground and limited expected movement | HDPE can be used where the project design selects it for these conditions. | Identify the HDPE area and the layers below and above it. |
| An area where the ground is expected to move and the design calls for a more flexible liner | Use the selected LLDPE grade in that area. It does not replace proper ground preparation. | Mark its boundaries and how it joins the surrounding liner. |
| A slope or toe area where grip between layers is important | Use the textured surface selected for the actual contacting materials. The toe is the lower edge of the heap. | State whether the rough side faces upward, downward or both ways. |
| An area where the design allows smooth surfaces | Use the selected smooth membrane. | Keep these rolls clearly separate from textured grades. |
A rough upper surface may be required where the liner contacts the protective material above it. A rough lower surface may be required where it contacts the soil below. Use double-sided texture when both contacts need it under the design. The team must check the actual combination of materials; roughness alone does not prove that a slope will remain stable.
Full product details are on the HDPE geomembrane, LLDPE geomembrane and textured geomembrane pages.
Protect the Liner from the Material Above It
The first layer placed over the membrane is often called the overliner. It must be selected carefully. A sharp stone can press into one small spot even when the average load across the pad seems acceptable.
Confirm the size and shape of this material before ordering the protection products. If a cushion fabric is needed, check the proposed fabric together with the membrane and the actual stones under representative loading. Fabric weight alone does not tell you whether the liner will be protected.
If that arrangement does not provide enough protection, the project team may change the stones, bedding, cushion, membrane or placement method. A heavier fabric is only one possible change. It can also change how the layers grip each other.
Make the accepted combination clear in the material schedule. If a contractor proposes locally available stones or a different fabric, review the change before using it. Product information is available on our nonwoven geotextile page.
Give the Liquid a Reliable Route Out of the Heap
The liner keeps the solution inside the system. The drains must carry it to the collection points. If they cannot, liquid can build up above the membrane and leave parts of the heap too wet.
Check the drainage layer and pipes for the weight of the completed heap. Show how the pipes are supported, where they discharge and how the outlets can be inspected. Consider whether fine particles, mineral deposits or pipe deformation could reduce flow.
Do not replace the main drainage layer and pipes with a drainage geocomposite simply to reduce earthworks. A drainage geocomposite is a manufactured drainage product. It can be useful in a defined role, such as collecting leakage between two liners, when its performance under the expected pressure has been checked.
The drainage systems page explains the wider product options. On this pad, the drawings should give every drainage layer a clear purpose and destination.
Check Changes to the Layers on Slopes
Layers can slide against each other. The contact with the least resistance to sliding may control the safety of the arrangement.
This is why a change to the cushion fabric, soil or membrane surface can matter even if the new product has similar basic specifications. Where required, test the actual contacting materials under the relevant loads. ASTM D5321/D5321M is one method used for this check.
If procurement proposes a substitute, have the project team review the changed combination before it is ordered. A rougher surface or heavier fabric is not automatically a better solution.
Resolve Three Details Before Construction Moves Ahead
Trenches and pipe connections
A membrane needs support where it crosses a change in level. A sheet stretched across a poorly prepared trench edge can be damaged when protective material and ore are placed above it.
Draw the connections between the pad floor, collection trenches and structures before installation. Show the support below the sheet and how it joins pipes or concrete. Leave enough access for the installer to finish the detail and for the inspector to check it before covering.
Edges reserved for later expansion
A phased project needs a clean, protected strip of liner for the next section to join. Mark that strip and keep traffic, contamination and excavation away from it.
Before joining new material to an old exposed edge, check the old sheet’s condition and agree how the connection will be prepared and tested. New material cannot solve a damaged or unsuitable old edge by itself.
The first layer placed over the membrane
This work can damage a liner after its seams have already passed testing. Agree how the protective material will be delivered and spread, which equipment may enter and what cover is required beneath it.
Keep unprotected equipment off the sheet. Check large folds, areas spanning gaps and connections before covering. If damage is suspected, expose and assess the area while it can still be reached. Do not bury the concern beneath the first ore lift.
General procedures are covered in the geomembrane installation guide. Put these site-specific details into the leach pad construction plan.
Use Three Checks Before Loading Ore
Check the prepared ground. The responsible inspector confirms the ground level, support and surface condition. Soft spots, ruts, protruding stones and erosion are dealt with before laying the liner.
Check the completed liner. Record the installed rolls and panels, seam tests, repairs and retests. Inspect connections and edges reserved for expansion. Complete any additional leak survey required by the project.
Check protection and drainage. Confirm that the agreed materials and placement method were used. Record pipe and outlet locations. Resolve possible damage caused during covering before releasing the area for ore loading.
Name the person who accepts each stage. The ground crew, liner installer and loading contractor should work from the same records. Seam test results do not cover damage caused by later equipment or material placement.
Keep Useful Records for Operation and Repairs
After the liner is buried, most of it cannot be seen. Routine checks should focus on collection flow, outlet condition, liquid levels, any leakage monitoring system, and exposed edges or connections. Set clear action points in the operating plan so staff know when to investigate a change.
Keep drawings showing the installed liner and pipes. These records matter when ore is removed, the heap is reshaped or a new section is added.
Kinross’s 2019 account of Walter Creek at Fort Knox, Alaska, gives a useful example. Before reshaping the heap’s front face, its team planned protection of the liner and piping. Kinross reported completing the work over 7 million square feet without damage to those components. [4]
This is not a Planetliner project. The lesson is to locate and protect buried materials before sending equipment into an operating area. The same approach helps plan access for future repairs.
Learn from Two Documented Mining Projects
These are public industry references. Planetliner is not claiming material supply or installation at either mine.
Kışladağ Türkiye shows why one pad may need several liner arrangements
Eldorado Gold’s Annual Information Form for 2024 describes a two-part system at Kışladağ: a low-permeability clay layer or GCL, together with a 2 mm polyethylene membrane. It reports double-sided texture at stability toe areas, smooth or some single-sided textured LLDPE in regular areas, and HDPE where prolonged sunlight exposure is expected. The report also describes 10 m lifts and interlift liners. These are reported project details, not universal selection rules. [9]
The procurement lesson is to specify by zone and function. A single order description of 2 mm mining liner can omit differences that matter to deployment and acceptance. Each grade and surface arrangement should remain identifiable from delivery to the as-built record. This lesson is our interpretation of the reported design.
Walter Creek Alaska shows why maintenance must protect buried infrastructure
In a November 2019 project account, Kinross describes regrading the front face of Fort Knox’s Walter Creek heap leach facility to improve access for leaching. Its Technical Services team planned protection of the existing pad liner and piping. Kinross reported resurfacing 7 million square feet in two months without damage to those components. [10]
For contractors, the useful point is the planning sequence. Rehandling ore and reshaping a working heap should begin with records of buried liners and pipes, approved equipment limits and coordination with operations. This is our practical interpretation of the account, rather than a procedure that can be copied to another mine without design review.
Prepare a Clear Material Inquiry
Give suppliers the information needed to quote the same job:
- Pad plan:how it will be used, construction phases, final heap shape, slopes, collection points and lined area.
- Site conditions:mining solution and concentration, temperatures, ore grading, final loads and placement equipment.
- Materials by area:selected polymer, thickness, surface direction, protection, drainage and quantities.
- Acceptance documents:project requirements, supporting test reports, any independent testing and shipment documents.
- Delivery needs:phased quantities, usable roll sizes and weights, unloading equipment, installation date, destination and delivery term.
Mark anything still undecided. This allows the supplier to discuss the material options while the project team resolves the remaining detail. Do not treat an unreviewed substitute as a way to rescue a delivery date.
The offer should identify the products and quantities for each area, roll arrangement, available documents and delivery scope. When requesting SGS evidence, check which sample and tests the report covers. Also agree who supplies the materials, who installs them and who accepts the work.
Use the linked product pages for full specifications. General thickness guidance and price information have their own pages. For this project, compare offers against the same material schedule and acceptance requirements.
Send Planetliner your heap leach pad drawings, approved material specification, quantities by zone, solution and temperature conditions, load information, required documents, target delivery date and destination port. If the design is still developing, identify the unresolved points so we can discuss material supply options while your engineering team completes the checks.
We offer virgin-resin polyethylene liners without recycled resin and can discuss custom performance and roll arrangements. Ask for the relevant available technical data and test evidence for the proposed grade. Our role is material supply and export coordination; local construction, testing and engineering approval should be clearly assigned in the project contracts.