Plastic Geomembrana LLDPE HDPE geomembrane pond liner for aquaculture farming landfill mine water ponds

Plastic Geomembrana LLDPE HDPE geomembrane pond liner for aquaculture farming landfill mine water ponds is a kind of geosynthetic material, it is waterproof, impermeable, and UV resistant.Geomembrane pond liner is a very low permeability synthetic membrane liner or barrier used with any geotechnical engineering related material so as to control fluid (or gas) migration in a human-made project, structure, or system.

Our Geomembrane pond liner specifications:

Thickness 0.2mm-3mm Popular thickness are 0.5mm,0.75mm,1mm,1.5mm,2mm,can be customized.
Width 1m-8m popular width is 5.8m,7m and 8m,can be customized
Length 50m 100m 140m 200m Can be customized
Color Black Green,blue,white color can be customized
Surface Smooth,Textured Double sides smooth surface,One side smooth one side textured, Double sides textured surface

Our Geomembrane Pond liner Features:

  • Waterproof and impermeable
  • UV resistance(black color)
  • High tearing resistance
  • Puncture-resisting
  • Nontoxic
  • Long life
  • Root resistance

Geomembrane Pond liner Production

Our geomembrane products use 100% new materials, no recycled/secondary materials! Safe and non-toxic, excellent performance, meeting our company’s mission to protect our environment!

Our  geomembrane production use blowing film or calendering process, the polyethylene resin is heated to the melting point in the extruder barrel and the resin molten stream go through a screen pack and up through a die. The pond liner is extruded from the circular die as a bubble, pulled vertically by a set of nip rollers. An liner Cooling unit maintains consistent liner diameter. The bubble passes through a collapsing frame and be directed back toward the ground, and continues cooling. Before being packed by the winder, the geomembrane bubble is split and cut to its customized width.

geomembrane production process

Raw material

The raw materials are all from the world famous professional manufacturers, the quality is stable, same as Solmax NAUE Agru Layfield Atarfil raw materail, from the source to ensure that the products meet the requirements of customers.

hdpe geomembrane liner resin

 

Production process

Our company uses automatic weighing and mixing. Compared with traditional manual mixing, the formula accuracy is 5% higher and there is no pollution.Screw heating temperature, conveying raw materials, fully stirring and filtering air impurities, plasticizingtemperature, increasing output.The aluminum shell is insulated, so that the raw materials are fully and uniformly melted into a fluid at a constant temperature, and the puncture resistance and tearing resistance of the geomembrane are improved.High-efficiency cooling air ring, large air volume, high flow rate, wide dispersion, stable film bubble, good cooling effect and high production capacity.The inflation ratio of the mold controls the thickness of the geomembrane, and the diameter controls the width of the geomembrane.The height of the mold reaches 20 meters, so that the film bubble has enough time to cool down, and the tensile strength, elongation at break, tearing force, etc. of the geomembrane are improved.Center roll package: automatic deviation correction system, neat and beautiful, convenient transportation and convenient construction.

geomembrane raw materialHDPE GEOMEMBRANEgeomembrane liner manufacturer

QA/QC and Test machines

Our company has more than 20 years of industry experience, has obtained ISO9001,ISO45001 and ISO14001 certificates, product production meets the ISO quality management system.

Complete quality control process, raw materials,production and processing to product delivery process all meet the ISO system.Raw materials should be tested before entering the warehouse,check the factory with the material report, at the same time the laboratory do test, rejected unqualified, Only good quality can be put into the warehouse!Production process online detection of thickness and integrity, if there is thickness unqualified or loopholes, production will immediately stop, and QC check product thickness, tensile strength, elongation, tear strength, CBR and other specification, to ensure the production meets customer requirements.Retention samples will be tested before the products leave the factory, and the bulk samples will be taken and marked with the production batches and production dates. Retention samples will be made for traceability, and samples will be retained for 2-5 years.

Perfect testing equipment, fast and accurate testing of product technical data, meet ASTM testing standards,and guide production.Quality guy is engaged in the geotechnical industry for more than 10 years, can quickly and accurately detect the quality of products, and obtained the training certificate of national testing institutions.

Geomembrane Quality Control Process

 

Geomembrane test equipments

 

Packing Solutions

geomembrane packing with woven bag and plugs Geomembrane packing with white woven bag and paper tube and plugs geomembrane packing with tube geomembrane packing with black woven bag

Delivery and Container loading

hdpe geomembrane loading

 

Projects applications

For large-scale projects, on-site guidance from offline engineers can be provided.A4 samples are free, customers need to pay courier fee.Special size samples can be customized for customers,and also need to be charged separately.

1.5mm 2mm ASTM GM13 Landfill hdpe geomembrane liner for landfill

Landfill project. Material: 1.5mm HDPEGeomembrane,400gsm geotextile   Area: 52710 square metres      Country: Cambodia   Time: 1 st June, 2020

This is the first government landfill project with HDPE geomembrane in Cambodia ,4 ponds can deal with the rubbish in Battambong

Landfill project. Material: 1.0 mm HDPE Geomembrane, 0.75 mm HDPE cap    Area: 500000 square meters   Country: China    Time: 1 st August,2021

This is the largest ladfill in Linyi City ,which can deal with about 20 tons of civil rubbish every day ,which reduce the civil pollutions siginificantly and protect our environment.

hdpe geomembrane for biogas project

Biogas project. Material: 1.5mm HDPE  Country: Thailand  Area: 60000square meters   Time: January 2020

Philippines fish pond 1mm pond liner

Fish Pond Project  Material:1mm HDPE Geomembrane  Area:20000 square metres  Country:Philippines

hdpe geomembrane liner for water treatment

Water treatment project Material:1.5mm hdpe geomembrane  Area:40000sqm  Country:Thailand

hdpe geomembrane liner for oil project

Oil gas  project Material:1.5mm HDPE geomembrane  Area:30000sqm  Country:Iraq

 

1. Can you do OEM?

Yes

2. how can we guarantee quality?
Follow ISO certification, Always a pre-production sample before mass production;Always final Inspection before shipment;
3.Can you provide free samples/
Yes, samples are free. you pay the express fee.

4. what is your advantage?100% virgin material, no recycled/used material.ISO  CE certification, Third-party test report, stable quality. Your orders are the same good quality, Good for your reputation!

Reasonableprice. Your purchse cost is not the highest, and your profit is guaranteed!

Fast production time 3-15days.Your capitalturnoverrate is high!

Safe, cheap, and fast ship and train.Your import process becomes easy, transportation cost is low, and helpful for your capital turnover rate!

Project construction engineers support.Your project is a successful case, can be shown to others!